Quantcast
Channel: SCN: Message List
Viewing all 8676 articles
Browse latest View live

Re: JMS Adapter with Topic (PI 7.3) with multiple cluster nodes.

0
0

Hi,

 

Could you please say us to resolve this issue? We are also facing the same issue in Dev. Hence our SAP PI 7.3 cannot connect with IBM MQ 7.1, getting information as "Channel Inactive" in rwb..

 

With Regards

Amarnath M


Re: File to IDOC scenario

0
0

Yes, the option is to read the whole line and put into the single field and you have to split these into fields during mapping.

If you do not need the last record to read then you may delete the last line before mesage processing from the OS command in the comm channel. You can use FCC for this case.

 

/AB

Re: HTTP client code 401 reason ICM_HTTP_CONNECTION_BROKEN

Re: MessageTransformBean - endSeparator

0
0

Hi Martin,

 

You can try populating the number of segment 1 more than the requirment with the blank values like below:

 

<OUTPUT>

     <LINE>

          some stuff

     </LINE>

     <LINE>

          some more stuff

     </LINE>

     <LINE></LINE>

</OUTPUT>

 

Hope this will create the CRLF in your last line.

 

/AB

Re: Getting data from excel in IF_UJ_VALIDATION_RULE_LOGIC~DO_VALIDATION_LOGIC in SAP BPC 10

0
0

Hi Dzmitry,

 

As far as I remember, all changed values send by input schedule during single send operation will be processed by one UJ_VALIDATION_RULE_LOGIC call as a table. Then you can read  values from the cube, replace old with new values, do aggregation and check the result.

 

Vadim

Re: MRP3 view fields

0
0

MPGD_MASS IS A structure not table. any other ideas?

Re: How to remove * from BI Report?

0
0

You can do it directly in prod if you have access to SBIW t-code. If you do not have access, then you need to transport from Dev.

Re: Sap B1 version 9 y Crystal Report

0
0

Estimados:

 

Gracias a todos por su ayuda, al fin he conseguido que funcione el crystal, los pasos que seguí fueron los siguiente:

 

1- instale SAP B1 version 9

2- Instale SAP Business One Crystal Report Integration Package (el cual viene con el instalador de SAP)

3- Verifique que el runtime instalado fuera el que viene con la versión 9

4 - Instale Server Integration

5 - Instale Crystal Report 2011

 

finalizadas las instalaciones reinicie la maquina, una vez iniciado el sistema ejecute crystal y listo.

 

ahora funciona sin problemas

 

Gracias a todos por su tiempo

 

Saludos


Re: Address group ME01: Delivery address changed from PO

Re: JavaScript start-up API (ABAP Backend) response is slow

0
0

Hi Stefan

 

That does seem a long time. I've just tested and recorded it here - the same call, same depth, takes 135ms. I'm not saying that was the first time it was called, but it's probably worth you doing some performance analysis on the execution starting with HANDLE_REQUEST of /UI2/CL_START_UP_HANDLER.

 

cheers

dj

Re: Getting data from excel in IF_UJ_VALIDATION_RULE_LOGIC~DO_VALIDATION_LOGIC in SAP BPC 10

0
0

P.S. At least WRITE_BACK is working this way.

Vadim

Re: Reconciliacion Externa

0
0

NG,

 

Este es un comportamiento normal de la B1.

 

Saludos,

 

Marcelo Silva Santos

Re: ERROR while replicating data source

0
0

Hi,

 

Go to RSA1-->Source systems-->seelct your system-->right click-->check. This will check the RFC connection, if it gives you any error, then immediately inform to your BASIS. They will restore RFC connection and then you try to replicate again.

 

Regards,

Suman

Re: Accounting Document-Tax Code

0
0

Hi Vandita,

 

Can you provide your screen shot what is coming and what exactly you want there?

 

Waiting for your reply.

 

Thanks,

Suman$

Re: How planning strategy 60 works

0
0

Hello Prashant

 

The setting should be changed on the component A1.

 

BR


Caetano


Re: Question to multiple dependent webservice calls in Integration Process ccBPM

0
0

Hi Michael,

 

>>>>>1. Do I  have to use a multimapping transformation for example in step 4 or can I set the received session ID in the next request message by means of a container operation or other action within the integration process?

 

I would suggest to go with containers. You can check and see how you can use the values to make another web service request.

 

>>>>>2. The webservices are giving back a fault message with this sructure:

<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/">

   <soapenv:Body>

      <soapenv:Fault>

         <faultcode>soapenv:Server</faultcode>

         <faultstring>InvalidUsernamePasswordCombinationException</faultstring>

         <detail/>

      </soapenv:Fault>

   </soapenv:Body>

</soapenv:Envelope>

 

Within PI fault messages have got other structures. How can I use the given fault message type within the synchronous web service call to be able to do exception handling?

 

AFAIK, SAP does not provide a container in BPM for fault messages neither does BPM return the fault message.

which version of PI are you on.

check the SAP note, point 2:

https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1050827

I am not sure if SAP has introduced this functionality in the latest versions.

However there is another thread which can help you identify if it is a fault message:

http://scn.sap.com/thread/1680326

 

Hope it helps!

Ambrish

Re: Error in Infopackage Extraction

0
0

HI

 

Can u pls paste the code written in the infopackage file routine.

and pls state with what name the file is stored.

Re: Material price control

0
0

Hi,

You have following options and chose best option.

Option-1:

As you are creating purchase order and check your MM pricing procedure find condition type used for material.Now use  in t.code:M/06 and keep Condition category T (Moving cost) for that condition type and save.Now  create purchase order, price will picks from MAP price of material master.

 

Option-2:

Refer and go for adopting PO price from PR

http://scn.sap.com/thread/3170319

and set tolerance limit for purchase order  tolerance keys PE and SE  your company code in following path:

SPRO -> MM ->  Purchasing -> Purchase order -> Set Tolerance Limits for Price Variance

 

Regards,

Biju K

Re: Funds reservation :Quantity check at procurement process

0
0

Hi,

 

The control happens always on the amount level. However, the commitment reduction could be managed on the basis of a quantity. For example, PO with 5 units of 10$ each is reduced by a IR of 2 units with a price of 12$. If the commitment is managed on amount level the reduction would be 24, hence the rest of commitment would be 50-24=26. But, if the commitment is managed on quantity level, the reduction would be only 20 (2*10), and the commitment will remain on the level of 30. This is defined in the unit of measurement of the article in question.

 

I emphasize once more, though, that all the controls are happening on the amount level only.

 

Regards,

 

Eli

Re: How to enhance the element size in order to get a better error decription

Viewing all 8676 articles
Browse latest View live




Latest Images