additionally nothing is now getting provisioned. Could this change to notification affected anything else?
Re: Stopping AR workflow at rejection
Re: Valuation type not shown during GRN
Hi Jurgen
I tried this too but no solution for that
One thing i came to know that in PR it is maintained "DOMDF" but here it is showing "DOMDP"
if in case it is fetching from PR then also creates a doubt regarding this.
Thanks
Nikesh Patel
Re: FBRA error
Hi,
Pls check which of the documents are cleared, you need to exclude those and then try FB08. For cleared documents you need to execute FBRA.
best regds
Subha
Re: SAP HCM Payroll issue
Could you check once again Mark weekly off as working day and give lop on the same date.
Can you change monthly work schedule from off to working day and mark it as LOP
Please let me know If it is working or not
Re: FBRA error
Hi,
Generally we find the document is not clear but during reverse it through error.
Process:
1. 1st Reset/ reverse the document in FBRA.(When we make the invoice and make the payment , if it is through automatic clear , then we chose the open items for making payment. if we make the payment through manually and after clear the document , fully, partial or residual , it shows open item in FBL3N)
If any confusion please let me know...
Regards,
Shyam
Re: DB2 - DR process
Hi Hari
Then No need of HADR.
you just apply the logs daily on standby node.
and put the log in pending.
When you and to bring it up complete the logs by end of logs
and bring up the system.
Thanks
Sadiq
Crystal report working on local machine but after deploying on sever not showing
Hi,
I have crystal report.It is running on local machine but after deploying on server not showing on browser.
no error is showing.I already installed on server-CRforVS_redist_install_64bit_13_0_5.
and CRRuntime_64bit_13_0_5.
please help me because it is not showing any error.
thank you in advance.
Re: SSO: "Internet Explorer cannot display the webpage"
The reason was, that the affected users were member in too many AD Groups. The maximum header size must also be configured in the windows registry of each involved computer. We increased that value to the maximum by group policy, now it works.
Re: Parallel Replication taking time using SLT configuration
Hi Saritha,
there is no need to directly start the jobs from SM37, but you can do it from MWBMON the way you described. Just keep one thing in mind: If you mark the restart option while 2 jobs are already running, and you want to start another 2 jobs, you need to specify 4 as the number of jobs. The restart option means that the number of jobs you specify is the TOTAL number of jobs that should run, so we calculate the difference between the number of currently running jobs and the number of jobs that you specify, and schedule this number of jobs. As soon as all access plans are calculated, the overall status of the table will switch to calculated = 'X', and the initial load will start.
Kind regards,
Guenter
Re: portal runtime error
hi winterburn ,
kindly paste the screen shot , we caanot know what error you are getting
Re: reuse_alv_grid_display particular rows must be disable while displaying
Thanks Rmesh. it is working Fine
Re: Packing Instruction
Please search again in scn,
I have found these links
http://help.sap.com/saphelp_470/helpdata/en/65/79f32ea70111d2b44e006094b9b9dd/content.htm
You can understand with the above link.
Also check the thread.
Re: Not appearing the Batch number for Blocked stock
Re: Request processing failed. (XLS 000009) Universe generation failed for resource id
Hi,
Which Connectivity are you using?
and from which user are you seeing dashboard.?Does user has sufficient rights to view Dashboard?
Re: Service Matket Place register
Re: Tax deduction based on slabs
Dear Expert,
It is requested to please reply.
Regards,
Supriya
Material Determination-Issue after partial Delivery
Dear Experts,
We are using material determination functionality in our project.
The reason for substitution here is non availability of stock of ordered material, because of which system seeks the stock of substitute material.
The way we have configured is: When material is entered in sales ordered, system check stocks of entered material, if available partially provides the available stock & seeks for substitute material, where even if partial stock for substitute material is available, one more line is created for this material.
This line created as a sub item.
The order items look as under:
10) 5893343 50.000 EA
20) 5893343 09.000 EA
30) 5893653 03.000 EA
10) Is entered item.
20) Entered item available stock
30) Substitute item available stock
At this point of time when we create partial delivery for line item and later when we upload the stock for entered item, availability check cannot be carried out in the order, since all the items become grey out.
This is a very critical issue in our case. Kindly suggest some solution of go ahead.
Thanks in advance
Yogesh
RE Table for RERAOP -One Time Posting-Header
Hello Experts
Can anyone help me with the table for one time posting in REFX.
Regards
David
Re: Send Email through SDK DIAPI when i raise sales order in SAP b1
Hi Vjay,
What is your B1 version/PL? What addon do you have now?
Thanks,
Gordon
Re: Time Management @ 50hours in a week
Please reply