Thanks Ajay and Denis
Best Regards,
MJ
Thanks Ajay and Denis
Best Regards,
MJ
Hello Shivam,
As Manas pointed out, the SAP system needs to be stopped.
Furthermore, to save yourself from any trouble, before any changes:
- note what the current key-phrase is
- backup the SecStore.key and SecStore.properties files from the /SYS/global/security/data folder.
Best Regards,
Peter
Hi Vishal,
Check whether the below is active
Check in SPRO -> Financial Accounting (New) -> GL Acctng. (New) -> Business Trans. -> Doc. splitting -> Define Doc. splitting characteristics for GL
Moreover, if the WBS element has the Profit Centre, then i guess you need to contact your FI consultants to confirm the above configuration
Regards
Terence
I am trying to create a Stored Procedure universe in SAP BO 4.2 but it’s showing below error,
Below are the steps that I have followed to create a Stored Procedure universe.
Using Quick Wizard ->Click here to choose Store Procedure universe->Entered Universe Name, New Database Connection->I was able to see available SP's.
I selected one SP-> Add->In Stored Procedure Editor it was asking for Enter parameter value.
I enabled parameter Stored_Proc_Universe as Yes.
But it was throwing below error:
Exception:DBD,ORA-06550:line 1,column 8:
PLS-00306:wrong number or types of arguments in call to 'SP_BO_TEST'
ORA-06550:line 1, column 8:
PL/SQL: Statement ignored
State: N/A
Please can someone help me to resolve this issue.
Hi Experts,
Requirement :-
When Employee is terminated his Employee group which is currently "1" Active, But it must be set to EE Group as Terminated status "4".
Can anyone guide me how to configure dynamic action for terminate action with change in EE group from status "1" to "4"
(1- Active , 4-Terminated Status).
Regards,
Hare Rama
the first code is working well... the problem dont exist more
Hi,
we've installed the latest (2.3) Analysis for Office Add-On with EPM and we have the latest BW release with BPC 10.1 SP10. A new Feature is the the BPC Plug-in which is part of Excel. If we get it right, you can see open Tasks drectly in Excel without use Web UI. But the Buttons to use this new Feature are "greyed out (see attached Picture). Does anyone know how to run this? Do we have to set a Parameter in SPRO or something like that?
Hi Omer,
was rewriting it within notepad but doesn't work for me.
Its further crashing, if I set the values.
BR,
Dirk
Hi Karol,
Do you have special exchange rate maintained in the invoice header?
Normally the caused of currency value difference are all included in Note 526623.
Best Regards,
Owen
Hi,
while iam going for initial stock upload using T- code MB1C with mvt type 561, it gives the below error message. in before i have already maintain the closed period for material master record for the year 2006..(T-code MMPV).for 1000 plant , but here i want upload the stock in 1100 plant.
it gives the below error mesg.
Entry 1100 does not exist in T001 (check entry)
Message no. 00058.
Posting only possible in periods 2006/12 and 2006/11 in company code 1000
Message no. M7053
If i have enter the current plant 1100, it shows the error below megs.
Diagnosis
The posting date entered is not within one of the permitted posting periods (current period/previous period).
This can be due to one of two reasons:
The correct current period has not been set in the system.
For the system, the first of the entered periods is the current period. At the beginning of a new period, your systems administrator must change the current period in the material master record, using the function "Shift periods". This has not yet been done.
You have entered a wrong date in the field "Posting date".
Procedure
Check the posting date and correct it if necessary. If your input is correct, inform your systems administrator that the "period shifting" (period-end closing) process has not yet been completed. Copied from M8022.
Can you please try resolve the Error Mesg....
Regards,
Sree.