Hi Ahmed,
Thanks for your valuable links,
Ramesh.
Hi Ahmed,
Thanks for your valuable links,
Ramesh.
Hi,
For the issue
ERROR 2015-11-18 12:00:54.285
CJS-30023 Process call '/usr/sap/W22/SYS/exe/run/brconnect -u / -c -f chpass -o SAPSR3 -p XXXXXX' exits with error code 5. For details see log file(s) brconnect.log.
I suggest you to follow SAP KBA 2141078 - Perform Oracle Post_load activity fail with BR*Tools errorto check again,if still issue persists then re-share the updated brconnect.log & sapinst.log files from the system ?
Regards,
Hi Jakob,
I'm pretty sure you can navigate to the Label object via the following method inherited in the Input Field class (CL_WD_INPUT_FIELD):
GET__LABELLING_ELEMENT
You'll need to get a reference to the Input Field object from the container first and cast it to the class CL_WD_INPUT_FIELD.
The object you get back from GET__LABELLING_ELEMENT should cast to CL_WD_LABEL and from there you can get the text.
Hope this helps.
Regards,
Nick
Hi SAP Experts,
Would like to ask for your help on the macro for safety stock if the method to be used is MZ? Should I remove Row: Safety Stock (Planned)?
Thanks a lot for your help.
Sincerely, Ria
Thanks & sorry for not reporting the version. I am on 7.11
sorry for the late close.
Hi Pranil,
I had the exact same problem. I found I miss typed the "Content Modifier" type for "xPath". I had java.lang.string instead of java.lang.String. It's meant to be a capital S.
Re-saved and deployed.
regards,
Jeff
Hi,
Refer below link and note to setup IT performance reporting.
Set-Up IT Performance Reporting - SAP Solution Manager - SAP Library
1223266 - IT performance reporting in SAP Solution Manager
Hope it helps.
Br, Vaibhav
Hi All,
I've one service entry sheet with 2 line (qty of 1st line is 0.5 and 2nd line is 0.5) and the value is 466k.
However, when service entry was posted/accepted, the GR document created with only 1 line item with qty = 1 and the value is more than 466k (GR value = 853k)
I've try to revoke the service acceptance but it trigger an error (deficit of PU GR qty)
Appreciate your help,advise and comments.
Thank you.
Hello
Yes you can. You need to ensure that the configuration is done under Base System Interfaces -> Financial Planning Settings -> Define Financial Planning Settings. Ensure that mapping exist between Financial Views and corresponding cProject Rates/Functions
Regards
C
Hi Sriram,
It's total calculating same way like other wage type regular wage type is projecting.
Taking the CRT result of Wage type /3F5 for all past month for the current financial year and then current month RT table value of wage type /3F5 and projecting for the rest of the financial year.
Here /3F5 and /401 is playing the vital role and all this done at INEPF standard function and stored in the /3F6 wage type which is further taken into Chapter VI calculation.
Hope so it's clear to you now.
Regards,
Sankarsan
hi Jerold
You can very well use SAP PA 2.3 and SAP lumira 1.29 for your 32 bit machine, easily, I hope it has min 4 GB RAM else the system will run slow. Below are snapshot of the hardware requirements for both along with links provided by SAP, please go through them.
SAP PA- https://websmp102.sap-ag.de/~sapidb/012002523100013427772015E/pa23_install_en.pdf
SAP Lumira- http://help.sap.com/businessobject/product_guides/vi01/en/lum_129_install_en.pdf
Regards
Ranajay
Hi Gurus,
In Inter company STO,When doing GR with respect to out bound delivery in MIGO getting a error ''UPDATE CONTROL OF MOVEMENT TYPE IS INCORRECT(ENTRY X X _L)
ERROR MESSAGE NO: M7226
I Checked OMJJ t-code all configuration setting are fine and i checked shipping details document type also fine.
IN QIF system not getting any error but at a time of PIF system we are facing this error.
Why this error is coming?
please provided the solution for this issue....
advance thanking
Regards
Jash
Hai SAP Comunity,
I have some trouble,I am able to upload my plan values by period not by year. I dont know how to do that? anyone can help?
And how can I upload my plan values to excel by period use GLPLUP?
Thanks
Thanks Inaki, I will follow your advise and will update you if I have any issue. Thanks a lot again
Hello All,
I am working on GRC AC 10.1 with SP Level 8
I have added LDAP connectors and ECC connectors in User Detail tab of Data Source Configuration in SPRO.
If I go on to remove the ECC connectors from User Detail tab of Data Source Configuration, then I get a error while using PSS which states ' E-mail NOT maintained '
But if I maintain the ECC connectors along with LDAP connectors in User Detail tab of Data Source Configuration, then I am able to reset the Password of the respective user successfully using PSS.
I guess, system fetches the E-mail id of the concerned user from the respective ECC system for which he/she is trying to reset the password.
If I remove the ECC connectors and only maintain LDAP connectors in User Detail tab , then can the system fetch E-mail ID of the concerned user from the LDAP connectors maintained in User Detail tab of Data Source Configuration ????
Please suggest .
Regards,
Rahul Muni
Hi Jogeswara,
Thank you for your helpful advice.
I will check it.
Hi Venkatesh,
Which portal version are you on and where in Portal Content in this iview?
Regards,
Rajiv
Hello,
Batch status is active in OMCT configuration for all the plants?
What the enhancement do you have?
Best Regards,
R.Brahmankar
Hi Pradeep,
You can use SDK s for it , but in general SAP BusinessObjects Design Studio can access SAP HANA systems or SAP NetWeaver BW systems as BI backend systems as well as Universe.
Why dont you create a Universe on ACCESS or ORACLE and try consuming it.
Thanks,
Tanush