Hi,
Any master data change after transactional data wont update anything in the already posted documents. You have to do it manually or through any data upload / change program like lsmw.
Regards,
AKPT
Hi,
Any master data change after transactional data wont update anything in the already posted documents. You have to do it manually or through any data upload / change program like lsmw.
Regards,
AKPT
Hi Anil,
This is from the Email Output.
-Sowmya
Hi,
Can you try with class CL_GUI_CFW.
Arivazhagan S
If the NTP PO has GR done for partial quantity linked to a particular G/L account. Now if the G/L account is blcoked and there is a movement to a new G/L account how should the posting happen for the baalnce PO quantity.
Thanks Jef. My reply below.
Are you restoring a BPC 7.5 NW backup on a BPC 10.0 NW environment?
Yes
Before taking a backup of 7.5, first run the UJA_DATA_CHECKER program.
If you find errors, they should be fixed first before taking a backup.
Yes, there was no issue.
In BPC 10 system, which SP are you running and have you looked at note 1748232 ?
SP 15
You can also try to run the restore in the background, instead of foreground.
When chosen background, it does not allow to select the file path. Hence chosen foreground.
How long does the restore run? You might need to increase rdisp/max_wprun_time
It runs for couple of mins
Secondary window can not expand dynamically,
you have to put those items(item details) into main window. then only it will react dynamically if no of row increase or decrease.
Hi All,
Reduce the Info pack size when get the below error while loading SPM Data through portal.
Maximum size of a data packet in kByte to 500
Number of data packets per Info-IDoc to 5
error message - "Data target EXPORT data cluster is too big for the application (0000140180) inactive; processing stopped. Activate data target"
Hi,
I want to add custom fields in service entry sheet table ESSR, for this I have use enhancement SRVEUSCR, first I have added the additional fields in the include CI_ESSRDB, then in Custom subscreen 'SAPLXMLU 0399' I have added the required field from ESSR on the screen.
Now the added fields are coming properly in the ML81N screen as Additional Data, Now the values in additional fields are depend on the values of ESSR-EBELN and ESSR-EBELN field but in function exit
EXIT_SAPLMLSR_020
EXIT_SAPLMLSR_021,
I can see only the include fields CI_ESSRDB, other field of ESSR are not coming on which I want to set the values of my custom fields.
So in which exit I can add the code, to get the the values in my custom field depending on ESSR-EBELN and ESSR-EBELP.
Regards,
Zafar
Thanks Colleen for your prompt response. I hope some expert went through this requirement earlier and was able to sail through.
Thank you.
Anjan Pandey
Hi Carlos,
You need to activate CTS project and then setup project assignment mandatory.
So every transport will ask for the project always!
Solman:
Satellite system:
Rg Dan
Yes, That's because SMBLN doesn't update...
You have to do reversal from MIGO with original reference number...
If you do from MB01, system can't find the previous GR reference number...
You can see your LFBNR is updated with previous GR number...
You can't get the transport back. Proceed manually as I have earlier suggested.
hi dev,
as i am technical consultant not much knowlegde of functional .
i just want to know i have to develop two logics ?
1 one for cancellation through MIGO
2. cancelllation through MB01
for 2 point what fields of mseg i have to consider so that reverse doc. not show in report
will thankful to you
its urgent.
vikas
Hello Priyank,
Either you can add the function group manually as Matthew Billingham says.
May be you can try the below step.
Create a new transport in SE09 and include the object to the new transport from the old transport by using Include objects (ctrl+F11).
Hi Hitesh,
It's triggering...
But would like to know if there is any other way to trigger the standard methods without raising the event.
If you can observe in standard programs of FPM, even SAP uses multiple components in FPM conifguration... and for all the components the required standard methods triggers.
So it may use some other configurations to trigger the standard methods, If you have any idea, please throw some light on this.
This is just for additonal information, but the above problem is solved by raising an event.
Thank you!
Hi Mat,
There was error in function group and I repaired in Dev system.Now the function group is working fine. but the same error is also existing in prod system.After repair the workbench TR( I have the TR number with me) got deleted accidentally.If it create a transport with the entry R3TR FUGR <FG name> and move it to production system will it work in prod?..Because using the old TR the function group was repaired and now in new TR(as per your above suggestion)will be having a function group which was already repaired.
Also request you to provide the details to create an entry as mentioned above.
Thanks for your reply.
Regards,
PD
Hi Anil
Kindly refer the SAP Note
1939438 - "User is missing credentials..." error while registering a connector within UWL
Regards
Sriram